Introduction
Installing a stone worktop can transform the look and functionality of your kitchen or bathroom, offering durability, style, and long-term value. However, many homeowners and renovators underestimate the time and process involved. Whether you’re working with granite, quartz, marble, or another natural stone, it’s crucial to understand the timeline to manage expectations and coordinate other trades effectively.
This guide outlines every step of the process, from initial consultation to final installation, providing an accurate estimate of how long it typically takes to install a stone worktop.
How Long Does It Take to Install a Stone Worktop? Full Timeline Guide
The timeline for installing a stone worktop typically ranges between 7 and 21 days, depending on various factors such as material choice, supplier availability, fabrication complexity, and site conditions. Below is a breakdown of the full timeline.
1. Initial Consultation and Quotation (1–3 days)
The first step involves contacting a stone worktop supplier or installer for a consultation. You’ll discuss:
- Your project scope
- Preferred stone type (e.g., granite, quartz, marble)
- Kitchen layout or design plans
- Budget expectations
Once details are provided, most suppliers will return a quotation within 24 to 72 hours.
Time estimate: 1–3 days
2. Site Visit and Template Creation (2–5 days after approval)
Once the quote is accepted, the company will schedule a site visit to take accurate measurements. This stage is vital, as it ensures the stone is cut to the exact specifications of your space.
Templates are either created using physical materials or digital laser technology. It’s essential that base units are fixed and appliances like sinks and hobs are on site before templating.
Time estimate: 1–2 hours for the visit, but scheduling may take 2–5 days depending on availability.
3. Fabrication of the Stone Worktop (5–10 working days)
After the template is created, the fabrication process begins. This step includes:
- Cutting the stone slabs to size
- Edge profiling
- Polishing
- Cut-outs for sinks, taps, and hobs
- Quality checks and sealing (if necessary)
The fabrication time depends on:
- The complexity of the design
- Material availability
- The supplier’s workload
Time estimate: 5–10 working days (1–2 weeks)
4. Installation Day (1 day)
Once the stone is fabricated and delivered, the installation can proceed. This is usually completed in one full day for a typical kitchen. During installation, the team will:
- Position and secure the stone
- Apply joints and sealants
- Fit under-mount sinks and cut-outs
- Finalise the finish and polish joints
Note: It’s advisable not to use the worktop for 24 hours to allow adhesives and sealants to fully set.
Time estimate: 1 day
5. Post-Installation Checks and Final Adjustments (1–2 days)
In some cases, a follow-up visit may be necessary, particularly if:
- There are visible seams or joints requiring polish
- Appliances need adjusting to fit around the worktop
- Additional sealing is required (especially for natural stones)
While not always needed, it’s common for professional companies to include this as part of the service.
Time estimate: 1–2 days (only if required)
Total Estimated Timeline: 7–21 Days
Stage | Estimated Duration |
Consultation & Quote | 1–3 days |
Templating | 2–5 days |
Fabrication | 5–10 working days |
Installation | 1 day |
Final Checks (if needed) | 1–2 days |
Total Time | 7–21 days |
Factors That Can Affect the Timeline
1. Material Availability
If the stone you’ve selected is out of stock or needs to be imported, you may face delays. This is especially true for rare marbles or exotic granites.
2. Complex Design Requirements
Custom edge profiles, curved cuts, waterfall ends, or full-height splashbacks will add to fabrication time.
3. Installation Site Access
If your home is difficult to access (e.g., narrow doorways, multi-storey buildings), installation may take longer and require special handling.
4. Scheduling Conflicts
Busy periods (such as spring and summer) can result in longer lead times for both templating and installation.
5. Additional Trades
If plumbing, cabinetry, or electrical work needs finishing before templating or installation, this can push back the schedule.
FAQs (Frequently Asked Questions)
Q1: Can I install a stone worktop before my cabinets are fitted?
No. Stone worktops require solid, fixed base units to be in place before templating and installation. Trying to install them beforehand can lead to misalignment or even cracking.
Q2: Do I need to be home during the templating or installation?
Yes, it’s advisable. Installers or surveyors may have questions about layout, preferences, or cut-outs that require immediate decisions.
Q3: Can I use my kitchen immediately after installation?
You should avoid heavy use for at least 24 hours to allow adhesives and sealants to cure properly. Light usage, like placing items on top, may be fine depending on the installer’s advice.
Q4: How long does it take to install a worktop with a waterfall edge?
A waterfall edge adds complexity and weight to the installation. Expect the overall installation time to increase by several hours, and fabrication may take an additional 1–2 days.
Q5: Is sealing necessary for all stone worktops?
No. Quartz is non-porous and usually doesn’t require sealing. Natural stones like granite and marble, however, often need to be sealed initially and re-sealed periodically to prevent staining.
Q6: Can I install my own stone worktop to save time?
It is highly discouraged. Stone worktops are heavy, brittle if mishandled, and require specialist tools and techniques. Improper installation can void warranties and lead to costly damage.
Conclusion
Installing a stone worktop is a multi-stage process that typically takes between one and three weeks, depending on the scope of the project, materials used, and availability of suppliers and installers. While the process might seem lengthy, careful planning and expert installation ensure a long-lasting, beautiful addition to your space. By understanding each stage—from consultation to post-installation—you can manage your project timeline effectively and avoid unnecessary delays.
Whether you’re renovating a kitchen, upgrading a bathroom, or fitting out a new build, taking the time to get your stone worktop installation right is always worth the wait.